Pegasus Group - BUILDING SUCCESS
  • Home
  • About Us
  • Services
    • Project Timeline
    • Project Initiation
    • Planning/Design
    • Construction Execution and Monitoring
    • Project Closeout
    • Move Planning and Coordination
  • Projects
    • Case Studies
    • Higher Education >
      • Academic Projects
      • Campus Student Services
      • Science
      • Student Housing
      • Athletics
      • Infrastructure-Higher Ed
    • K-12 Education
    • Research and Development
    • Housing
    • Corporate / Commercial
    • Mission Critical
    • Healthcare
    • Infrastructure
  • Contact
  • Project Timeline-In Progress

PROJECT OVERVIEW


Lilac Hill and Union Street Student Housing,
Student Health and Counseling (SHAC) Facility, and
Utility Infrastructure Project

Carleton College, Northfield, Minnesota

NEW STUDENT HOUSING​ - LILAC HILL AND UNION STREET
One of 
Carleton College's goal for this project is to add 207 townhouse style beds at two development sites, which will achieve the goal of 20% of this type of student housing. The new housing replaces 130 beds of existing inventory in older houses throughout campus.  
 
The first development site, Lilac Hill, is a new location for student housing located at the north end of campus near the Recreation Center. The second site, Union Street, is located along Union and First Street near existing townhouses. Programming and design began in February 2022, with construction starting spring, 2023. Phase 1 was completed in the fall of 2024 with the addition of five townhouses and the Area Director house/office at the Lilac Hill site, as well as, two townhouses (including the Multicultural and Black Centers) and the renovation of the Dacie Moses House at the Union Street site. Phase 2 adds three additional townhouses and the SHAC building at the Union Street site which will be complete in the fall of 2025.
 
An essential element to Carleton's housing program is the cultural and interest designated houses and spaces. As part of this project, many of these existing spaces will be replaced by new construction. New spaces will ensure the Student Life programs continue to be successful, offer adequate and accessible community gathering spaces, are flexible to meet future changing needs, and function in a way to build a sense of community.

STUDENT HEALTH AND COUNSELING (SHAC) FACILITY

The current Student Health and Counseling Center will be relocated from its current location in Davis Hall to the new building on Union Street where the new student townhomes are built. The main goals of the SHAC project are to have a facility that:
  • Is compliant with the Health Department and ADA Accessibility Code requirements.
  • Allows staff to support student health and well-being on a personal caring level.
  • Provides higher quality of care for students on campus vs. outsourced clinic.
  • Reflects the Carleton Campus Community and is student centric.
  • Provides adequate functional space for today’s needs and future growth.
  • Is designed for efficient and organized services for students.
  • Supports an increase in student usage.
  • Provides an efficient flow of services for interaction of staff.
  • Is located in a convenient, high traffic area of campus that students frequent.
  • Conveys an all-encompassing Fitness, Medical Health and Counseling Center.
  • Is designed to provide a safe and healthy work environment for staff.
  • Is designed to be energy efficient and ecologically responsible.
 
UTILITY INFRSTRUCTURE

The additional student housing and Student Health and Counseling facility requires connections to the campus chilled water supply, Carleton’s new low temperature hot water supply, the campus electrical service and low voltage systems for both sites. 

Carleton College has a strong commitment to sustainable building practices as outlined in their 2011 Climate Action Plan. The College has pledged to become a carbon neutral campus by 2050. 

​Budget
$76,756,000


Square Footage
75,460 sf - Student Housing
20,353 sf - Student Health and Counseling Facility (SHAC) 
BACK TO Student housing PROJECTS
Phase 1 Buildings Received PHIUS CORE 2021 Certification​
Picture
​PHIUS (Passive House Institute, U.S.) is the leading passive building certification program in North America. The organization certifies housing projects that use design to minimize energy use. Requirements include airtightness, window comfort, and moisture and thermal designs that increase energy efficiency while reducing costs.
LINK TO SHAC CONSTRUCTION SITE WEBCAM
"Pegasus Group has delivered outstanding service to Carleton College. They immerse themselves into every detail of the project and are not afraid to hold the project team accountable for decisions and performance. Moreover, Pegasus Group recognizes the importance to understand their client's goals, culture, decision making and business processes, and how best to support us. They have the unique ability to interact effectively at all levels in the organization and are extremely professional in their approach."
~ Steve Spehn, Director of Facilities and Capital Planning (retired)
​COPYRIGHT © 2025 PEGASUS GROUP - ALL RIGHTS RESERVED.
  • Home
  • About Us
  • Services
    • Project Timeline
    • Project Initiation
    • Planning/Design
    • Construction Execution and Monitoring
    • Project Closeout
    • Move Planning and Coordination
  • Projects
    • Case Studies
    • Higher Education >
      • Academic Projects
      • Campus Student Services
      • Science
      • Student Housing
      • Athletics
      • Infrastructure-Higher Ed
    • K-12 Education
    • Research and Development
    • Housing
    • Corporate / Commercial
    • Mission Critical
    • Healthcare
    • Infrastructure
  • Contact
  • Project Timeline-In Progress