Pegasus Group - BUILDING SUCCESS
  • Home
  • About Us
  • Services
    • Project Timeline
    • Project Initiation
    • Planning/Design
    • Construction Execution and Monitoring
    • Project Closeout
    • Move Planning and Coordination
  • Projects
    • Case Studies
    • Higher Education >
      • Academic Projects
      • Campus Student Services
      • Science
      • Student Housing
      • Athletics
      • Infrastructure-Higher Ed
    • K-12 Education
    • Research and Development
    • Housing
    • Corporate / Commercial
    • Mission Critical
    • Healthcare
    • Infrastructure
  • Contact
  • Project Timeline-In Progress

PROJECT OVERVIEW


Engineering and Applied Technology Center
Century College, White Bear Lake, Minnesota

​The scope of work entailed the renovation of two floors and the new construction of a mezzanine in the Main Building on the East Campus. The renovation created a multi-disciplinary Engineering and Applied Technology Center that includes learning commons and flexible lab space 
used by Computer Science, Math and other STEAM Programs. The welding lab was also expanded and upgraded to meet the needs of the Applied Technology/Mechatronics Program which is expanding its program into robotic welding competencies. The space now supports continuing education and customized training.

The scope also included addressing ADA and deferred maintenance, increased energy efficiencies with new systems that adhere to B3 Minnesota Sustainable Building Design Guidelines. 

The project was delivered using the Construction Manager at Risk method.
Budget
$6,966,000


Square Footage
4,000 sf new construction
​10,600 sf renovation 
BACK TO SCIENCE PROJECTS
​COPYRIGHT © 2022 PEGASUS GROUP - ALL RIGHTS RESERVED.
  • Home
  • About Us
  • Services
    • Project Timeline
    • Project Initiation
    • Planning/Design
    • Construction Execution and Monitoring
    • Project Closeout
    • Move Planning and Coordination
  • Projects
    • Case Studies
    • Higher Education >
      • Academic Projects
      • Campus Student Services
      • Science
      • Student Housing
      • Athletics
      • Infrastructure-Higher Ed
    • K-12 Education
    • Research and Development
    • Housing
    • Corporate / Commercial
    • Mission Critical
    • Healthcare
    • Infrastructure
  • Contact
  • Project Timeline-In Progress