Pegasus Group - BUILDING SUCCESS
  • Home
  • About Us
  • Services
    • Project Timeline
    • Project Initiation
    • Planning/Design
    • Construction Execution and Monitoring
    • Project Closeout
    • Move Planning and Coordination
  • Projects
    • Case Studies
    • Higher Education >
      • Academic Projects
      • Campus Student Services
      • Science
      • Student Housing
      • Athletics
      • Infrastructure-Higher Ed
    • K-12 Education
    • Research and Development
    • Housing
    • Corporate / Commercial
    • Mission Critical
    • Healthcare
    • Infrastructure
  • Contact
  • Project Timeline-In Progress

PROJECT OVERVIEW


Boiler Room Improvements
Lake Superior College, Duluth, Minnesota
​

An existing firebox hot water boiler was replaced with two new condensing boilers and a boiler room combustion air system with associated piping revisions. An existing hot water storage tank system was removed and replaced with a new condensing gas hot water heater and electric backup. Other work included new category IV stacks, the creation of a new corridor, and test & balancing and temperature controls.
​​

​Budget
 $877,000
BACK TO INFRASTRUCTURE PROJECTS
​COPYRIGHT © 2025 PEGASUS GROUP - ALL RIGHTS RESERVED.
  • Home
  • About Us
  • Services
    • Project Timeline
    • Project Initiation
    • Planning/Design
    • Construction Execution and Monitoring
    • Project Closeout
    • Move Planning and Coordination
  • Projects
    • Case Studies
    • Higher Education >
      • Academic Projects
      • Campus Student Services
      • Science
      • Student Housing
      • Athletics
      • Infrastructure-Higher Ed
    • K-12 Education
    • Research and Development
    • Housing
    • Corporate / Commercial
    • Mission Critical
    • Healthcare
    • Infrastructure
  • Contact
  • Project Timeline-In Progress