Pegasus Group - BUILDING SUCCESS
  • Home
  • About Us
  • Services
    • Project Timeline
    • Project Initiation
    • Planning/Design
    • Construction Execution and Monitoring
    • Project Closeout
    • Move Planning and Coordination
  • Projects
    • Case Studies
    • Higher Education >
      • Academic Projects
      • Campus Student Services
      • Science
      • Student Housing
      • Athletics
      • Infrastructure-Higher Ed
    • K-12 Education
    • Research and Development
    • Housing
    • Corporate / Commercial
    • Mission Critical
    • Healthcare
    • Infrastructure
    • Religious Institutions
  • Contact
  • Project Timeline-In Progress

PROJECT OVERVIEW


Boiler Replacement
Minneapolis Community and Technical College, Minneapolis, Minnesota

​
Existing boilers, water heaters, pumps, piping, controls and accessories were replaced with new equipment including two new 600 HP boilers, two new 75HP condensing boilers and two new gas-fired water heaters with heat exchangers.

Budget
$1,810,000

back to infrastructure projects
​"Pegasus Group has proven themselves to be competent and professional." ~ Roger Boz, Physical Plant Director
​COPYRIGHT © 2025 PEGASUS GROUP - ALL RIGHTS RESERVED.
  • Home
  • About Us
  • Services
    • Project Timeline
    • Project Initiation
    • Planning/Design
    • Construction Execution and Monitoring
    • Project Closeout
    • Move Planning and Coordination
  • Projects
    • Case Studies
    • Higher Education >
      • Academic Projects
      • Campus Student Services
      • Science
      • Student Housing
      • Athletics
      • Infrastructure-Higher Ed
    • K-12 Education
    • Research and Development
    • Housing
    • Corporate / Commercial
    • Mission Critical
    • Healthcare
    • Infrastructure
    • Religious Institutions
  • Contact
  • Project Timeline-In Progress